Korea MFDS registration · KGMP · On-site document review

Korea registration,
starting with an on-site review
at your facility.

Before committing to a full registration project or transferring extensive documentation, we can assess MFDS feasibility and identify key documentation requirements, including through an on-site review when appropriate.

You do not need to share sensitive documents during the initial consultation. An on-site review can be arranged when appropriate.

Why Einstra

Three practical strengths in Korea MFDS and KGMP projects: on-site review, document control and reasonable pricing.

Strength 01

On-site focused review

Early assessment can be carried out inside your facility, based on your real processes and documentation flow.

  • Reviews performed within your environment when appropriate
  • Focus on how your actual system works in practice
  • Feasibility judged on real conditions, not only on paper
Strength 02

Minimal document transfer

Sensitive documents can remain under your control during the early stages of the project.

  • Initial discussions without sending full document sets
  • On-site or controlled-environment document review
  • Only the necessary files are shared when truly required
Strength 03

Reasonable, staged pricing

Work is divided into clear stages so that you only commit to the scope you actually need.

  • Discovery and initial assessment separated from full projects
  • Transparent scope and fees for each phase
  • You pay only for the stages you actually need in Korea

Core services for Korea MFDS & KGMP

The focus is Korean MFDS registration and KGMP audit readiness. Additional global alignment support is provided when appropriate.

MFDS strategy & feasibility

Korean MFDS registration strategy

Early technical evaluation may be conducted through direct collaboration with your team, clarifying classification, documentation gaps and feasibility before entering a full MFDS project.

  • Initial remote review based on summary
  • On-site feasibility assessment & gap list
  • Clear project scope before full engagement
KGMP audit preparation

Preparation for KGMP inspection

Preparation focused on practical readiness, document clarity and inspection flow.

  • Audit scenario mapping
  • Training on Korean KGMP inspection procedures
  • On-site support during audit period
Engagement model

Clear staged process

Projects progress in structured stages to reduce uncertainty.

  • Discovery → Initial assessment phase → Detailed plan → Full project
  • Transparent scope at each stage
  • Predictable timelines and deliverables
Annex · Global document alignment

Once the Korean strategy is defined, documentation can be aligned with EU / US requirements as needed, avoiding unnecessary duplication.

  • Comparison of Korean vs EU/US document sets
  • Reusable core document packages for multiple markets
  • Long-term documentation strategy for future submissions

Project examples

Illustrative project scenarios based on common needs of overseas manufacturers.

Class II manufacturer

On-site feasibility assessment

CE certified, no Korea experience

A 4-day on-site review mapped product structure, documentation status and MFDS pathways, enabling a realistic choice of entry level.

KGMP audit

Practical on-site support

Factory overseas

Support during the full audit period, including Q&A preparation and documentation flow.

No internal RA

Stepwise roadmap

Small manufacturer

Projects divided into manageable steps: documentation basics → risk management → MFDS → KGMP.

OEM / Private label

Global alignment

Multiple partners

Consolidated requirements across importer, MFDS and global documents, reducing repeated work and inconsistencies.

Product Registration Process

A typical Korea registration schedule. Timing may vary depending on product classification, test scope and document readiness.

Stage
Month 1
Month 2
Month 3
Month 4
Month 5
Month 6
Month 7
1. Registration dossier provision Provided from project start until the TCF review begins
Registration dossier provision
2. GMP audit Starts about 1 month after testing begins and lasts 2 months
2 months
3. Product testing Base duration is 4 months, with possible extension up to 10 months
4 months (up to 10 months)
4. TCF review Begins immediately after the standard 4-month testing period
2 months
5. Product registration Final registration step, typically around 2 weeks
2 weeks
* The chart shows the standard 4-month testing schedule. Testing may take up to 10 months; if extended, TCF review and product registration move accordingly.

Contact

A brief outline of your products and current status is enough for an initial discussion.

Whether it’s MFDS feasibility, KGMP readiness or document alignment, the first step is to understand your situation.

· Email or video call to begin
· On-site visit when appropriate
· Information used only for consulting discussions
If you prefer a call, you can add your time zone and preferred time windows.